Orange Line (Capital Metro)
   HOME

TheInfoList



OR:

The Orange Line is a proposed north-south light rail line that will serve the central spine of Austin from North Lamar to Stassney Lane. It is in the planning stages as a part of Capital Metro's Project Connect. It is estimated to begin revenue service as early as 2029.


History

A contract for preliminary engineering work along the line was approved on March 20, 2019. In 2020, the planned route was truncated in length to reduce construction costs, with bus bridges providing connectivity through the rest of the corridor. Potential future phases may extend the line north to Tech Ridge and south to Slaughter as initially envisioned — those alignments are expected to be included in
National Environmental Policy Act The National Environmental Policy Act (NEPA) is a United States environmental law that promotes the enhancement of the environment and established the President's Council on Environmental Quality (CEQ). The law was enacted on January 1, 1970.Un ...
processing to allow for conversion to light rail in the future.


Route

The Orange Line is long and will run in its own dedicated transitway, including the Downtown Transit Tunnel, which will allow it to bypass the traffic that plagues the corridor it follows. The Orange Line will operate from North Lamar Transit Center to Stassney & Congress, and will follow the current route of the Capital MetroRapid 801 or a similar alignment. It is planned to run along The Drag. Future extensions to the line would feature stations at Tech Ridge, Parmer, Braker, Rundberg, William Cannon, and Slaughter.


Stations

Stations are listed north to south.


References


External links


Map and fact sheet AFact sheet B
* Capital Metro Light rail in Texas Rail transportation in Austin, Texas Transportation in Travis County, Texas Proposed railway lines in Texas 2029 in rail transport {{Texas-transport-stub